Site Plan
Basement Plan
First Floor Diagram
Second Floor Diagram
Third Floor Diagram
Fourth Floor Diagram
Fifth Floor Diagram
Sixth Floor Diagram
Seventh Floor Diagram
- 3D Massing Views
This progress scheme accentuates the idea of a public outdoor core
that connects with the Brooklyn bridge park and the iconic view.
The
massing is an elevated rectangle that has a cut out to provide an
outdoor core circulation. The rectangular cut-out is dictated by the
view to the Brooklyn bridge tower. The studio, library & office
spaces are orientated towards the park. Having the Library cantilevered
and offsets under the mass exemplifies the use of form follows function.
Providing a communal stair to the auditorium, which is located at the
basement level helps with inviting the public into the space. The main
entrance to the building is located on lot #2. This helps the students
and staff enter the building without having to go down further towards
the park.
Materials & space quality have not been detailed. The main
purpose of this post is to keep understanding how the program &
massing start to engage eachother.
No comments:
Post a Comment